Train

Transforming connectivity in the Northconnecting the people, communities and businesses of the North

Our preferred Northern Powerhouse Rail network will:

Handshake

3.8 million

3.8 million people within 90 minutes of four or more northern cities

People

100000

Over 100,000 more jobs in our urban areas

Graph

£3.4 billion

GVA uplift valued at £3.4bn in 2040

Our vision is of a thriving North of England where modern transport connections drive economic growth and support an excellent quality of life.

The benefits

Aeroplane

Bring Manchester Airport within 90 minutes reach for 4.3 million people (with NPR and HS2)

Train and tunnel

Integrate with HS2, TRU and other rail schemes to maximise benefits for the North

Advanced manufacturing, Energy, Health innovation, Digital

Better connect the North’s ‘prime capabilities’ (advanced manufacturing, energy, health innovation and digital)

Connected

Increasing opportunities for both workers and consumers

Passengers

Reducing disruption and improving capacity across the network

Train

Delivering better freight services and reduced conflict with other traffic

Northern Powerhouse Rail could be delivered over a 20-year period through a combination of new lines, use of planned HS2 infrastructure, and major upgrades to existing routes

Commuters

The picture today

Over the last twenty years, Leeds City Region has seen rail passengers rocket. With over 30 million passengers a year, Leeds station is the busiest station in the North of England and the third busiest station in the country outside London.

Leeds City Region’s economy is blossoming, with its thriving tech and financial industries leading the way. It is imperative that the city secures a 21st century rail service it needs to help unlock its full potential.

Image of Tim Cook Tim Wood
Director, Northern Powerhouse Rail
Icon

Connecting and empowering the North's
prime capabilities

Advanced manufacturing

Advanced Manufacturing

Energy

Energy

Health innovation

Health Innovation

Digital

Digital

Map of routes

A blueprint for the future

Options currently being explored for Leeds City Region include a new railway line between Leeds and Manchester via Bradford, links between the new HS2 mainline and existing lines to provide fast services to Sheffield and Newcastle and major upgrades to existing lines to provide faster trains to Hull.

Northern Powerhouse Rail - upgraded line
TransPennine route Upgrade
Northern Powerhouse Rail - new line
Existing line
Linking Liverpool to HS2
Northern Powerhouse Rail hub station
HS2 line
Other significant economic centre

Northern Powerhouse Rail junctions with HS2

1
Junction on HS2 mainline for Leeds - North East services
2
Junction on HS2 Leeds spur to facilitate through services via existing Leeds station
3
Junction on HS2 mainline for Sheffield - Leeds services
4
Junction at Manchester Piccadilly to support Northern Powerhouse Rail platforms
5
Junction on HS2 Manchester spur for Manchester - Liverpool services
6
South facing junction on HS2 mainline for London - Liverpool services

Expectations

Northern Powerhouse Rail could deliver a step-change in Leeds connectivity, delivering transformational, clean, economic growth.

With Transport for the North’s preferred network, we expect:

Residents

A resilient and reliable network
that will reduce disruption and improve capacity

2.9 million
more people within 90 minutes of Leeds *

Train
Connecting businesses

77000
more businesses within 90 minutes of Leeds *

* Benefits are based on preliminary assessment and are subject to change.

The North must rise to the occasion. Now is the time to help make a vision for better rail a reality.

Northern Powerhouse Rail:

Connecting and growing the economy of the North of England.